The project is the cooperation between our company and Hunan Nonferrous Xintianling Tungsten Industry Co.
Project content: dredging and equipment installation of skip shaft shaft, installation of ground shaft tower and hoisting facilities, dredging and installation of water bin at the bottom of the shaft, powder ore recovery system, surface ore bin transfer system, skid steer unloading system, main ramp dredging and related roadway and chamber works.